Background:
Westinghouse currently utilizes many aspects of the Shipley method for their project management. As such, pink team review, red team review, etc. are key steps of project management and bringing a project to a successful close with required polishing, validation, and approvals.
The workflow is currently challenged and extra steps are taken to reset the project with the completion of each major review (pink, red, etc.) step. This involves mid-stream user management of a significant degree, loss of easily visible attribution to involved users as Westinghouse seeks to limit edits by past reviewers once their contribution is complete.
They’ve attempted to use sequential review but not all SMEs are in the platform and the function has been restrictive to how their teams operate. They’ve shared an example of where they attempted/explored using multiple projects as well to achieve this process:
i.e. run a project through the first reviews, with full attribution and tracking, then clone that project with all sections, questions, and answers before assigning the new reviewers, locking out the old while retaining that attribution and tracking in the first project.
Such a process provides some of what they are looking for, but creates other issues in terms of too much separation, user management of a different sort, and the reporting impact as now multiple projects roll-up to the same opportunity.
Proposed Enhancement:
Add to the project space the ability to manage versions of the project, such that we can solve the problem posed by using multiple projects for the same opportunity and provide a workflow that is a closer fit to Shipley methodology. As the 1st version sequence runs its course with AI, recommendation engine, drafting, 1st review, and all associated commentary, enable the ‘freezing’ of that version.
The project admin/manager can then start a second version that rolls over the sections, questions, answer, comment and activity history in the same project, but gives a fresh assignment space to new reviewers/guests. Version 1 assignees would still be visible in a separate non-active version space within the project.
Past reviewers from a prior version, would ideally no longer have edit permission in the new active Project Version 2, but would still be able to see the project content they were assigned to and could use the comment/discussion features to add commentary as others take their turn. Editing would be reserved for admins and those active in Project Version 2, 3, and so on.
Such an enhancement would reduce mid-project user allocation pressure, better preserve attribution/tracking, and enable better collaboration in heavy-review circumstances.